new boiler fitted into local church www.sthildaschurch.com/index.html
![www.sthildaschurch.com](https://www.phplumbing.co.uk/wp-content/uploads/2018/10/388435_50e08eb9.jpg)
st hildas church reached out to us and asked for our solution to the buildings heating requirements.we suggested a 40kw atag is40 system boiler and a 65kw low loss header to supply the heat to 3 heaing zones .
![atag is 40 kw heating power](https://www.phplumbing.co.uk/wp-content/uploads/2018/10/44286420_2180296012259226_3619588593556652032_n.jpg)
![worcster low loss header 65kw](https://www.phplumbing.co.uk/wp-content/uploads/2018/10/44245453_2196963997294873_8305105499234238464_n.jpg)
![underfloor heatin manifold](https://www.phplumbing.co.uk/wp-content/uploads/2018/10/44245490_297038191022873_2672269621540683776_n.jpg)
![atag flue termination have been updated to show just the black section](https://www.phplumbing.co.uk/wp-content/uploads/2018/10/44410746_2219057845041665_1179803833761529856_n.jpg)